This page briefly discusses aspects for planning and structuring analogue
|
|
verification and some of the inherent issues related with coverage. Most of
|
|
the examples will reference Cadence design tools which is common place but
|
|
alternative with similar flavors exist. This is somewhat specific to analogue
|
|
simulation that validates design from a functional point of view. This ties in
|
|
with the construction of the test bench that will probe various aspects of the
|
|
design to confirm that is operates as expected.
|
|
|
|
## Design Sign-Off
|
|
|
|
Sign-off for an analogue design could can imply a multitude of things depending
|
|
its dependency. An exhaustive list of delivery items is shown below. Many of
|
|
these are only relevant at certain points in the hierarchy but standardizing
|
|
the flow for creating each item is essential for systematic design. This
|
|
should allow you develop a check-list automated or manual for certain aspects
|
|
in each deliverable that ensure quality.
|
|
|
|
- Specification Table
|
|
- Schematic
|
|
- Spice Netlist ✔
|
|
- Verilog Netlist ✔
|
|
- Layout
|
|
- GDSII ✔
|
|
- DRC Report ✔
|
|
- ERC Report ✔
|
|
- LVS Report ✔
|
|
- LEF Abstract ✔
|
|
- Testbench
|
|
- Design Documentation
|
|
- Verification Report
|
|
- Design Review Checklist
|
|
- Digital Timing Model
|
|
- Test/Trimming Plan
|
|
|
|
Fortunately many of these items (✔) do not necessarily require manual intervention
|
|
and can for the most part be part of a automated flow that sanity-checks
|
|
different aspects of the design.
|
|
|
|
## Design Flow Automation
|
|
|
|
Several components in the industry analogue design flow are illustrated below
|
|
with their relative association. The verification process only touches a small
|
|
part in the overall picture but provides key indicators for many other aspects
|
|
of the design flow such as project planning, lab work, and software development.
|
|
|
|
```mermaid
|
|
graph LR
|
|
external@{ shape: notch-rect, label: "3rd Party IP" }
|
|
requirements@{ shape: notch-rect, label: "Design\nRequirements" }
|
|
design@{ shape: cyl, label: "Cadence\nDesign Database" }
|
|
reports@{ shape: docs, label: "DRC/ERC/LVS Reports\nCircuit Netlists" }
|
|
abstracts@{ shape: cyl, label: "GDSII\nLEF/DEF Abstracts" }
|
|
simulation@{ shape: docs, label: "JSON Database\nVerification Reports\nCircuit Documentation" }
|
|
labwork@{ shape: docs, label: "Measurement Reports\nRoot-Cause Analysis\n" }
|
|
webdocs@{ shape: procs, label: "**Documentation Portal**\nUsage Guide\nDesign Theory\netc."}
|
|
spotfire@{ shape: cyl, label: "Characterization Data"}
|
|
external ==> design
|
|
requirements ==> design
|
|
design == NVAFLOW ==> reports
|
|
design == NVAFLOW ==> abstracts
|
|
design == RDBDOC ==> simulation
|
|
simulation ==> webdocs
|
|
labwork ==> webdocs
|
|
```
|
|
|
|
Here I have highlighted two integration tools that automate and assist in
|
|
generating various aspects of the design sign-off. Some of which are not user
|
|
facing such as GDSII and LVS results which are handled by NVAFLOW and is
|
|
closely tied to the process-development-kit (PDK). The other tool is RDBDOC
|
|
which assists parsing the cadence database in order to generate and template
|
|
reports.
|
|
|
|
The point here being is that when we sign-off at top-level it is not unusual
|
|
for a large number of designs to be incorporated. Each of which should be
|
|
checked while it is frozen for external delivery. Such a tool can rigorously
|
|
generate all outputs systematically while also performing a series of sanity
|
|
checks to grantee design quality.
|
|
|
|
## Verification Plan
|
|
|
|
Planning analogue verification in a structured manner is challenging primarily
|
|
because one must often carefully consider what is important when simulating a
|
|
design. It is very easy to exhaustively simulate without actually gaining
|
|
confidence in the design.
|
|
|
|
Typically one would setup a test bench that checks for both specific
|
|
performance metrics such as phase-margin in a amplifier and generic performance
|
|
metric such as off-state leakage. Here is it good practice to have a base-line
|
|
of checks reflecting best-practices. A few examples of design-agnostic checks:
|
|
|
|
- Supply sensitivity
|
|
- Bias sensitivity
|
|
- Nominal current
|
|
- Leakage current
|
|
- Peak-to-Peak current
|
|
- Off-state / grounded controls
|
|
- Assertions for illegal states
|
|
- Distortion / Linearity
|
|
- Calibration/Configuration edge cases
|
|
- Debug coverage
|
|
- Output/Input impedance
|
|
|
|
It is important to keep in mind that these metrics are a baseline for evaluating
|
|
performance at a distance. One can obviously run a simulation an study the
|
|
transient waveform in detail but it is usually not feasible to do this over 500+
|
|
simulation points. This is why it is important to derive metrics for performance
|
|
that accurately reflect underlying characteristics with one or several numbers
|
|
that can be judged over corners and montecarlo.
|
|
|
|
Now as example a typical verification plan is presented that varies
|
|
process parameters in order to expose variations and weakness in the design
|
|
such that we have a good expectation of what post-silicon performance
|
|
characteristics will look like. This plan is divided into three steps with
|
|
increasing simulation effort.
|
|
|
|
``` markdown
|
|
This is a baseline where the designer must recognize the best way to stress
|
|
aspects of the design and adjust the plan accordingly.
|
|
```
|
|
|
|
### Simulation Corners
|
|
|
|
Generally there are three aspect to simulation corner definition:
|
|
Front-End-Of-Line (FEOL), Back-End-Of-Line (BEOL), Voltage+Temperature. These
|
|
parameters are very closely tied to the process and qualification standard the
|
|
circuit aims to achieve. Naturally the more demanding our qualification the harder
|
|
it is to guarantee performance over coreners. For example we can target a
|
|
temperature range of 0° 70°, -40° 85°, -40° 125° depending if we consider
|
|
consumer, industrial, or grade-1 automotive qualification in the JEDEC standard.
|
|
|
|
We distinguish between FEOL and BEOL because these are two different sets of
|
|
process parameters that are affected during fabrication that do not correlate
|
|
with one another. FEOL generally relates to device characteristics such as
|
|
threshold voltage, off-leakage, transconductance, and current drive while BEOL
|
|
relates to interconnect and Metal-Oxide-Metal passives such as capacitors and
|
|
inductors. A process will specify bias for FEOL and BEOL while the designer
|
|
will specify a bias for temperature and voltage. Together a collection of
|
|
parameter biases are grouped as corners and used to simulate circuits under
|
|
various post-silicon conditions.
|
|
|
|
FEOL corners will come in a variety of flavors for different purposes and
|
|
should be studied carefully. Analog circuits are generally not that interested
|
|
in worst-case leakage corners but a worst-case noise corner maybe available.
|
|
Analogue is generally interested in FF and SS extremities, sometimes called
|
|
total corners not to be confused with the global corners FFG and SSG, to if
|
|
trim ranges and bias ranges are sufficient to meet performance requirements.
|
|
|
|
Separately we should study BEOL corners. This is usually somewhat easier as the
|
|
extremities simply best and worst case capacitance as CWORST/CBEST or best and
|
|
worst interconnect time-constants as RCBEST/RCWORST. The designer should know
|
|
which set of extremes is worst. Typically low frequency analogue will suffer
|
|
most from CWORST/CBEST variation. High freuquency analogue and custom digital
|
|
may opt to use the RCWORST/RCBEST corners.
|
|
|
|
Verification can be planned and separated into three levels of confidence,
|
|
each with increasing simulation time. It is always advised to select corners
|
|
to find the best and worst case process conditions for our circuit.
|
|
|
|
### Level 1: Corner Simulations
|
|
|
|
Level 1 focuses on total corner simulation without montecarlo. The purpose here
|
|
is to demonstrate a brief overview of passing performance with DFM checks such
|
|
as EMIR and Aging. There maybe some back-and-forth with the layout and design
|
|
at this point as verification results are checked.
|
|
|
|
| **VT Corner** | **High Voltage** | **Nom. Voltage** | **Low Voltage** |
|
|
|---------------|------------------|------------------|-----------------|
|
|
| **High Temp** | | |FF/SS + CBEST/CWORST|
|
|
| **Nom Temp** | |TT + CBEST/NOM/CWORST| |
|
|
| **Low Temp** |FF/SS + CBEST/CWORST| | |
|
|
|
|
Total Simulations: 11 + EMIR + Aging
|
|
|
|
With these preliminary set of results one can pass some judgement over
|
|
circuit performance during design review. By including the DFM simulations
|
|
here (i.e. EMIR and Aging) the layout will be relatively close to the final
|
|
result.
|
|
|
|
### Level 2: Montecarlo Simulations
|
|
|
|
Level 2 focuses on presenting a typical distribution of performance metrics
|
|
using montecarlo methods. Here we must make an important choice of which mc
|
|
corner is used. Generally foundries will recommend to use the global corners:
|
|
FFG, SSG, FSG, SFG, and only apply local mismatch. This will yield good
|
|
statistical distributions in our testbench metrics and allow use to make
|
|
gaussian estimations to limit the number of simulations runs of the same
|
|
confidence interval opposed to a unknown distribution. A alternative here is
|
|
to use the typical corner and enable both local and global process variation.
|
|
|
|
| **VT Corner** | **High Voltage** | **Nom. Voltage** | **Low Voltage** |
|
|
|---------------|------------------|------------------|-----------------|
|
|
| **High Temp** | | |FFG/SSG+CBEST/CWORST|
|
|
| **Nom Temp** | |TT+CNOM| |
|
|
| **Low Temp** |FFG/SSG+CBEST/CWORST| | |
|
|
|
|
Total Simulations: 225 with 25 mc runs per corner
|
|
|
|
### Level 3: Completion
|
|
|
|
Level 3 is intended to be the target set of corners used to validate a design
|
|
across corners using montecarlo methods. This is an exhaustive simulation
|
|
job and doesn't quite cover all possible scenarios when combining FEOL+BEOL+VT.
|
|
Generally however it will a good representation of post-silicon results with a
|
|
high quality testbench.
|
|
|
|
| **VT Corner** | **High Voltage** | **Nom. Voltage** | **Low Voltage** |
|
|
|---------------|------------------|------------------|-----------------|
|
|
| **High Temp** |FFG/SSG+CBEST/CWORST| |FFG/SSG+CBEST/CWORST|
|
|
| **Nom Temp** | |FFG/TT/FSG/SFG/SSG+CBEST/CNOM/CWORST| |
|
|
| **Low Temp** |FFG/SSG+CBEST/CWORST| |FFG/SSG+CBEST/CWORST|
|
|
|
|
Total Simulations: 775 + EMIR + Aging with 25 mc runs per corner
|
|
|
|
This set of results ultimately feeds into the test program for the device.
|
|
The distributions can be used to set limits and measurement inferences
|
|
when binning and sorting fabricated devices.
|
|
|
|
## Verification Report
|
|
|
|
Reporting on our verification results should provide a overview on what the
|
|
circuit targets where, where the senstivities lie, and how non-idialities
|
|
manifest in circuit behavior. Lets discuss a general report structure and
|
|
provide an example.
|
|
|
|
- Design Files
|
|
- Simulator Setup
|
|
- Target Specifications
|
|
- Simulation Parameters
|
|
- Simulation Notes
|
|
- Results and Statistical Summary
|
|
- Distributions
|
|
- EMIR/Aging Results
|
|
|
|
With a ADE result database from Cadence we can export the data using skill
|
|
and generate a generic database file that can be parsed and post-processed by
|
|
python. This allows us to make a clean report that need minimal user input
|
|
while providing a good overview on simulation results external to the Cadence
|
|
environment. A cut-down version of such a report is detailed below. Notice
|
|
the designer should still contribute certain annotations to the report such
|
|
that it is self explanitory.
|
|
|
|
> # Verification Summary: MYLIB divider_tb
|
|
>
|
|
> lieuwel 2018-01-01
|
|
>
|
|
> ## Test Description
|
|
>
|
|
> This is a preliminary verification report for the divider circuit
|
|
> which is a 8-bit reconfigurable clock divider operating on the RF clock
|
|
> after the 4x clock divider from the counter module. This test bench
|
|
> is intended to verify correct operation for all divider settings.
|
|
>
|
|
> ## Test: Interactive.2:MYLIB_divider_tb_1
|
|
>
|
|
> Simulation started on 1st Jan 2018 and ran for 2035 minutes.
|
|
> The yield for this test is 100% to 100% (1675 of 1675 points passed)
|
|
> Verification state: 1/3
|
|
>
|
|
> ### Design Setup
|
|
>
|
|
> Library Name: MYLIB
|
|
> Cell Name: divider_tb
|
|
> View Name: schematic
|
|
> Simulator: spectre
|
|
>
|
|
> ### Parameters
|
|
>
|
|
> |Name|Expression|Values|
|
|
> | :---: | :---: | :---: |
|
|
> |clk_sr|15p|1.5e-11|
|
|
> |clk_pw|clk_pd/2|3.333333e-10|
|
|
> |clk_pd|4/6G|6.666667e-10|
|
|
> |div|0|0:255|
|
|
> |vdd|1.1|1.045, 1.1, 1.155|
|
|
>
|
|
> ### Specifications
|
|
>
|
|
> |Output|Specification|Pass/Fail|
|
|
> | :---: | :---: | :---: |
|
|
> |EnergyPerCycle|< 1p|Pass|
|
|
> |div_err|-100m - 100m|Pass|
|
|
> |div_meas|-|Info|
|
|
> |dly_out|< 100p|Pass|
|
|
> |fin|1.5G ±1%|Pass|
|
|
>
|
|
> ### Output: EnergyPerCycle
|
|
>
|
|
> Sample presents a mixed distribution. Using < 1p as specification requirement.
|
|
>
|
|
> |Corner|P0.16|P0.5|P0.84|Pass/Fail|
|
|
> | :---: | :---: | :---: | :---: | :---: |
|
|
> |C_BEST_HTHV|193f|193f, 193f|193f, 193f|Pass|
|
|
> |C_BEST_HTLV|168f|168f, 168f|168f, 168f|Pass|
|
|
>
|
|
> {{< figure src="/images/posts/verification/energypercycle-c-best-hthv.png" title="C_BEST_HTHV" width="250" >}}
|
|
> {{< figure src="/images/posts/verification/energypercycle-c-best-htlv.png" title="C_BEST_HTLV" width="250" >}}
|
|
>
|
|
> ## Summary
|
|
>
|
|
> Tests pass with good margin
|
|
>
|
|
> EMIR - pass (pre-TO) |